Our terms & conditions

Our scope of works and fees on each commission are based on the RIBA terms of engagement, which can be found here or alternatively we can provide a copy upon request. The RIBA terms of engagement will, where any omission occurs, take precedence over this document.

It is our experience that the RIBA standard forms of appointing an architect are the most efficient way for a client to appoint an architect. If in the future you wish to change this to a non-standard agreement we would regard any services provided in negotiating this agreement as additional services to be invoiced on a time charge basis as listed below.  We would also require a minimum of £1000 to cover our reasonable legal fees to be reimbursed in that eventuality.

Calderpeel Architect Services

1.0 Calderpeel Architects Limited (Calderpeel Architects or The Practice) shall:

1.1 Exercise reasonable skill and care in performing the services in accordance with the normal standards of the architect’s profession.

1.2 We are registered with the Architects Registration Board and are a Royal Institute of Architects Chartered Practice. We are required to practise in accordance with the professional codes of conduct of these institutions.

1.3 Calderpeel Architects cannot guarantee that any programme will be fully adhered to where external forces, consultants, Local Authority, Regulatory Bodies, Specialists, manufacturers etc. are required to feed into this programme.

Targets and cost

2.0 Calderpeel Architects cannot guarantee that any target or budget cost, or the timetable will be met, particularly where approvals from other parties, such as planning permission, building regulation approval, listed building and conservation consent are required, nor the performance, work or the products of others.

Clients’ responsibilities

3.0 The Client shall:

3.1 Advise Calderpeel Architects of the requirements and of any subsequent changes required;

3.2 Shall supply to Calderpeel Architects in a timely fashion, without charge, all necessary and relevant information in the possession of the Client or any of the Client’s Agents, consultants or contractors.

3.3 Give decisions and all necessary instructions, consents or approvals necessary for the performance of the Services.

3.4 Have authority to issue instructions to Calderpeel Architects, subject to Calderpeel Architects’ right of reasonable objection.

3.5 Calderpeel Architects shall rely on such information provided by the Client as above.

3.6 Calderpeel Architects shall not be liable for the consequences of any delays to the services arising from any failure by the Client to comply with these obligations.

3.7 Appoint and pay any consultants, or contractors required under separate agreements.

Copyright and Licence

4.0 Copyright in all drawings, design, documents and materials of any nature prepared by us for you (the ‘Intellectual Property’) shall remain vested in us but you shall have a licence to use the intellectual property for the purposes for which it was prepared. Calderpeel Architects asserts its moral rights and all other rights to be identified as the author of the creative work of Calderpeel Architects comprising the project.

4.1 The Client shall have a non-exclusive licence to reproduce and use and allow Consultants and Contractors providing services to the Project to use and copy drawings, documents and bespoke software produced by Calderpeel Architects in performing the Services, hereinafter called “the Material”, but only for purposes related to the Project on the Site, or part of the Site to which the design relates. Such purposes shall include operation, maintenance, repair, reinstatement, alteration, extending, promotion, leasing and/or sale of the Project, but shall exclude the reproduction of Calderpeel Architects’ design for any part of any extension of the Project and/or for any other project, unless agreed by Calderpeel Architects and the payment of a licence fee. No works of construction relying on our intellectual property are permitted under the terms of the above licence or otherwise without the express consent of the author.

4.2 All permissions and authority granted by Calderpeel Architects under the licence terms will automatically terminate upon the termination of the licence or in the event of any act of insolvency being committed by the licensee. The licence will automatically terminate in the event of late or non-payment of all or part of the fees under this Agreement.

4.3 Calderpeel Architects will only grant a licence for use of intellectual property commensurate to the agreed scope of services and stage of work. This licence is personal to you and non-assignable even in the case of a sale or legal transfer of the land, project etc to a third party. If the Client wishes to use the intellectual property for further stages of work on the Project and does not wish to retain our services on the Project, then the Client agrees to pay us a fee for continued use of copyright based on our calculation of what would be fair and reasonable for such works and/or use of intellectual property (this will be a minimum of 0.4% of the estimated construction cost).

4.4 Calderpeel Architects accepts and can have no liability or responsibility for or in respect of any unauthorised or unlicensed use of or any reliance placed upon these drawings or designs.

4.5 In the event it considers its copyright has been breached, Calderpeel Architects reserves the right to take legal action and seek costs and remedy including but not limited to an injunction preventing use of the copyrighted design and compensation in the form of payment of the Client’s profit made from use of the Material.

Liability and Insurance

5.0 Calderpeel Architects confirm that we currently maintain professional indemnity insurance in the sum of not less than £10m on an any one claim basis (or series of claims arising out of any one cause) and will continue to maintain insurance at a level which we consider to be appropriate for this project for a period of not less than six years from the date of Practical Completion, so long as such cover is available at reasonable commercial terms and sufficient cover for this project.  We have assumed that no collateral warranties will be required, however, if collateral warranties are or PI insurance above £10m is required, an additional fee will be required accordingly.

Targets, cost and construction

6.0 Any building costs stated within this letter or given verbally are given without prejudice and we recommend that you appoint a quantity surveyor to advise on these. These are also always exclusive of VAT.

Limits of liability

7.0 Calderpeel Architects is not responsible under this agreement or otherwise for advising on matters wholly, partly, directly or indirectly arising out of or resulting from asbestos or other deleterious material (including without limitation the costs of testing for, monitoring, abatement, mitigation, removal, remediation or disposal of any products or waste that contain such deleterious materials).

7.1 Calderpeel Architects is not responsible under this agreement or otherwise for designing or advising on or otherwise taking measures to prevent or mitigate the effect of any act of terrorism or any action that may be taken in controlling, preventing, suppressing or in any way relating to an act of terrorism.

Quality management

8.0 As a registered RIBA Chartered Architects’ practice, we are required to follow the RIBA Quality Management procedures, this gives you the comfort that all dealings with this practice will be in accordance with the Professional Standards and Codes of our governing bodies and to stringent Quality Management procedures.

Local authority dealings

9.0 Calderpeel Architects cannot guarantee that Planning, Listed Building, Conservation Area Consent/approval will be achieved on any project.

9.1 We would draw your attention to the fact that Local Authorities now request an increasing amount of supporting documents to be submitted with Planning Applications, the exact extent of this information is subject to both National and Local requirements; but is also subject to the demands of Planning Authorities and officers. What one Local Authority may demand is not necessarily what an adjacent authority would equally demand. Calderpeel Architects cannot therefore guarantee that all supporting documents or information requirements will be known at the time an application is submitted.

9.2 Calderpeel Architects will liaise with other consultants to assist in obtaining supporting documentation but cannot be held responsible for the time and extent that gathering such information may entail. The Client should note that the Planning Authority will not register a planning application until all supporting documentation is received.

Building regulations and other statutory approvals

10.0 Calderpeel Architects cannot guarantee that Building Regulation Approval will be achieved on any project; it should be noted that additional costs may be incurred. This practice has experience constructing buildings in many sectors and working with and anticipating the likely difficulties a project may attract.  However, the Building Regulations and Other Statutory regulations are open to interpretation by each officer.  Policy and regulation changes can affect the final outcome of a project, as well as the constraints of the Building, Environment, Site Conditions, Services, Other Consultants’ input.

10.1 It should be noted where dealing with the refurbishment, extension and alteration of existing buildings, that there can be many factors which can develop during the course of a project which would require additional detailing, or changes to the specification and detailing initially envisaged. This can be as a result of many factors such as cost, specification, manufacturer’s requirements, local authority requirements, site conditions, unforeseen elements, building condition or construction uncovered during the works, and interpretation of the regulations.

10.2 In addition to the above, we advise that a health and safety coordinator will be required to be appointed, a topographical survey may be required, and the services of a structural engineer, mechanical and electrical engineer, landscape architects, party wall surveyor, acoustics engineer and highways engineer may also be required and we can advise on these appointments if you wish in due course. Any building costs stated within this letter or given verbally are given without prejudice and we recommend that you appoint a quantity surveyor to advise on these.

Fees

11.0 Our proposed breakdown of our fee is by RIBA stages, and the services offered are as indicated in the RIBA Standard Professional Services Contract 2020.  All invoices, for all stages are raised monthly and are a percentage of the fee related to the percentage of the work stage or stages completed. All invoices are issued on strictly 14-day terms; we reserve the right to suspend services, charge interest and withhold copyright of our information if invoices are not settled within this period.

11.1 The quoted figures are exclusive of VAT, local authority fees/NHBC fees, SAP calculations, CIL and other third-party agreements / contributions but include reasonable expenses and disbursements such as printing and travel costs. Anything considered over and above reasonable will be charged as listed below:

a) Calderpeel Architects’ fees are calculated and charged as set out in the Appointment Proposal.

b) Marketing materials, deed/conveyancing and legal plans will be charged out separately based on hourly rates as listed below.

c) The Client shall pay Calderpeel Architects the fee stated in the Appointment Proposal for the performance of the services.

d) The Client shall pay Calderpeel Architects’ accounts, including any additional fees, expenses, disbursement or VAT in accordance with payment terms stated in the offer letter / Invoice issued.

11.2 If the proposed fee is to be based on hourly rates, these rates are listed after the terms & conditions.

11.3 The Client is responsible for the separate payment of Consultant, Specialist, Local Authority/Approved Inspector fees for each project.

Payment terms

12.0 Payment shall become due on submission of Calderpeel Architects’ invoice thereafter and the final date for payment.

12.1 Calculated from the date of issue of invoices for work (not receipt).

12.2 The payment terms will be clearly stated on any invoice.

12.3 Payment is due on delivery of our invoice to you.

Late payment interest

13.0 If the bill is not paid within the period stated on the invoice; interest shall be added to all amounts remaining unpaid thereafter and shall be calculated in accordance with the Late Payment Commercial Debts (interest) Act 1998 as amended and supplemented by the Late payment of Commercial Debts Regulations 2002 and the relevant reference rate plus the statutory rate of interest.

13.1 We reserve the right to charge [and will charge] interest on ALL overdue amounts because we are required to pay VAT and Framework charges on all Sales, as well as expenses and overheads on an accounts basis from point of sale.

13.2 We would also reserve the right to place any debt into the hands of a debt recovery agency following failure to pay within the specified period.

13.3 The client may not withhold payment after the final due date for payment of any sum unless the client gives not later than seven days’ notice specifying the amount proposed to be withheld and the grounds for withholding payment or if there is more than one ground each ground and the amount attributed to it.

13.4 Where a Fee is calculated on a percentage basis, the percentage or percentages stated in the Appointment Proposal shall be applied to the final cost of the building work, excluding VAT, fees and any claims made by or against the contractor or contractors. The percentages will be applied to the current cost estimate, or accepted tender, or the contract sum until the final contract sum has been ascertained.

13.5 Calderpeel Architects reserves the right not to continue with Services for the next stage of the project until the fee for the previous stage of the project has been paid by the Client. Calderpeel Architects also reserves the right not to proceed with work on a separate project, where the fees/or proportion of same for another project with the same Client remain unpaid.

Additional work

14.0 If Calderpeel Architects has to carry out additional work and/or suffers delay or disruption in the performance of the Services for reasons beyond their reasonable control the Client shall make an additional payment to Calderpeel Architects in respect of the additional work carried out and the additional resources employed and/or the delay and disruption suffered.

14.1 Additional fees shall be payable if Calderpeel Architects for reasons beyond their control, is involved in extra work or incurs extra expense, including requests by clients to amend layouts, details and design.

14.2 Any additional payment shall be calculated on a time basis in accordance with either a supplied schedule of rates or shall be accompanied by an analysis report in accordance with the hourly rates set out in the Appointment Proposal issued prior to commencement.

14.3 Calderpeel Architects shall be entitled to payment of any part of the fee for services satisfactorily performed together with any other amounts due at the date of any notice suspending or ending performance of any or all of the Services.

VAT

15.0 All sums due in connection with the appointment are exclusive of value added tax, the amount of which shall be paid by the Client to Calderpeel Architects at the rate and in the manner prescribed by law.

15.1 VAT will be charged at the standard rate at the time of invoice, and is applicable to all our fees.

Invoicing

16.0 We will submit an invoice on account for the fees and any expenses and disbursements due [plus VAT] monthly, or at completion of each work stage whichever is sooner.

Expenses

17.0 The Client shall reimburse expenses and disbursements; these will be itemised on Invoices.

17.1 Any additional expenses incurred will be quoted at the time they are instructed, required or raised.

17.2 Expenses will be charged at net cost plus a handling charge of 5% to cover administration to obtain documents.

Disbursements

18.0 Our fees exclude disbursements.

18.1 Any disbursements made on your behalf, such as payments to the local authority for planning submissions or Building Regulations submission/inspection fees, they will be charged at net cost plus a handling charge of 5%; alternatively at the time applications are made we will request a cheque made out to the Local Authority/Inspector which we may submit with the application [s], or your electronic payment direct over the phone.

18.2 We do not include in our fee proposals the fees of Local Authority submission/inspection fees, and such like, these are to be paid by the Client.

18.3 We do not include in our fee proposals the fees for any consultants. We will recommend their appointment at the appropriate stage in a project where these services are required.

18.4 We also do not include for the fees of any specialist advisers and reports which may be requested by the local authority during the application process.  We will advise you of the requirements for these during the scheme design and detail design stages of the project.

18.5 If required to do so, we will obtain fee proposal quotes on your behalf and forward these to you for approval. However, we would expect that the appointment of any consultant is an agreement between the Consultant and Client direct.

Records

19.0 Calderpeel Architects shall keep and make available on request records of any expenses and disbursements to be reimbursed at net cost and/or of time spent on Services charged on a time basis.

19.1 If you require time records to be kept on any projects, this needs to be advised at the outset of a project. We use an hours tracker application to record any time records where this service is requested.

Email policy

20.0 Unless you withdraw your consent we will communicate with you and others, where appropriate, by email, but cannot be responsible for the security of correspondence sent by these means.

20.1 It is your responsibility to check that an incoming email and attachments (if any) do not contain viruses.

Storage of paper and Documents

21.0 Clients should keep any Planning, Listed Building and Building Regulation Approval documents and Completion certificates safely as these will be required as part of the sale of any property/land for which they relate.

21.1 This office operates a paperless policy. We will only keep paper copies of documents whilst the stage of the project to which they relate is in progress. After this, documents are stored electronically until all fees are paid and the limit of our liability has expired.

21.2 We are required by the RIBA to keep drawings and documents for two years after completion of the Contract Limitation, which is 6 years where a contract is executed under standard terms, and twelve years where a contract is executed as a deed.  After this period has expired we have the right to destroy them. Should you request copies of any documents a charge will be made for any retrieval from archive, printing and copying.

21.3 We confirm that we retain the copyright of the electronic information, and in accordance with this and our ISO 9001-2015 procedures, will issue information only in PDF format. The only exception to this is where we are employed post Stage 4, where we will issue our electronic CAD files to other consultants, this will be on the understanding that these are not passed to a third party, and used solely for this project.

Assignment of the agreement

22.0 Neither the Client nor Calderpeel Architects shall assign or transfer any benefits or obligation conferred by the Appointment of Calderpeel Architects without the prior written consent of the other.  Such consent shall not be unreasonably withheld or delayed.

Suspending or ending the agreement

23.0 The Client or Calderpeel Architects can suspend or end performance of any or all of the Services by giving at least 7 days’ written notice of the intention and stating the reason for doing so.

23.1 If the reason for the notice arises from a default and the recipient does not remedy the matter, the agreement will end on expiry of the notice period.

23.2 Where Services are suspended by the Client and not resumed within 3 months Calderpeel Architects shall have the right to treat performance of the Services affected as ended on giving written notice to the Client.

23.3 Where services are suspended or terminated, we will be entitled to keep any papers, drawings and other documents, whilst there is money owing to us for our fees and expenses.

23.4 If at any stage you do not wish us to continue doing work or suspend working for a period of time, you must tell us clearly in writing.

23.5 Calderpeel Architects/The Client  may terminate the appointment in the event of breach of these terms by the other party or in the event of insolvency by providing two weeks’ written notice. In these terms ‘insolvency’ shall mean either party becoming bankrupt, going into liquidation (either voluntarily or compulsory except as part of an amalgamation), being dissolved compounding with its creditors or having a receiver, administrative receiver appointed of the whole or part of its assets.

23.6 If circumstances arise for which Calderpeel Architects are not responsible and which Calderpeel Architects considers make it irresponsible for them to perform any part of the service, they shall be entitled to terminate the appointment by giving two weeks’ notice.

23.7 In the event of any termination the Client shall pay Calderpeel Architects a fair and reasonable amount on account of the fees due, commensurate with the Services performed to the date of such termination and any outstanding expenses.

23.8 Termination of Calderpeel Architects’ appointment shall not prejudice or affect the accrued rights or claims of either party. In the event of a dispute or difference arising under this Appointment, this should be in writing.

23.9 We hope we shall be able to settle the matter by negotiation or mediation. Alternatively, either of us can start court proceedings to settle the dispute at any time.

23.10 Either of us can have disputes decided within 21 days by an adjudicator appointed under the Consumer Adjudication scheme.

23.11 The parties shall attempt in good faith to settle any dispute via mediation.

Notice in writing

24.0 Any notice given in connection with Calderpeel Architects’ appointment shall be in writing and given by sending the same by first-class letter to the Client or Calderpeel Architects at the address shown.

Collateral warranties

25.0 No allowance has been made for the provision of Collateral Warranties under this appointment. Should warranties be required an additional charge will be made.

Governing law

26.0 The law applicable to this Agreement shall be the law of England.

GDPR Privacy policy

27.0 Privacy is important to us. Our Privacy Policy covers what data we collect and how we use it, disclose, transfer and store your information.

27.1 Information We collect: We collect information about you if you make an enquiry as a potential client, or we do business with you as a Client, Consultant, contractor, subcontractor, Supplier or Manufacturer.

27.2 Use of Information: Any information we collect may be used to:-

•   Respond to you via your supplied contact details, you may choose to be contacted via email, or post.

•   Respond to you about projects by email or telephone.

•   The information you provide us with will be used to personalise our services to suit your individual or company’s needs.

•   To improve our website - we aim to improve our website and the information we publish so that it provides information on our projects and the services we provide.

27.3 From time to time we may send emails or correspondence about our practice, news, or service information.

27.4 We may on occasion use project images, drawings, photos or CGI visualisations of this project on our website, social media and hopefully for the purpose of Architectural awards. Any imagery will be displayed, strictly without reference to the client / owner, address or project value to respect our clients’ privacy. Should the client wish us not to share any project material, please notify us in writing at the time of our appointment.

Procurement terms & conditions

Calderpeel Design (Bespoke by Calderpeel)  procurement and supply services are undertaken in accordance with the Terms & Conditions set out below, which form part of our agreement with the Client and should be read alongside our agreed scope of works and fees.

Should the Client wish to negotiate amendments or enter into a non-standard agreement, any associated time will be treated as an additional service and charged on a time-charge basis, together with any reasonable legal fees incurred.

Supplier quotations, pricing and price changes

30.0 All supplier quotations are subject to the validity periods and conditions specified by the relevant supplier or manufacturer. Unless confirmed otherwise in writing, prices are not guaranteed beyond their stated validity period.

30.1 Quotations do not guarantee stock allocation, manufacturing capacity or delivery dates unless expressly confirmed by the supplier.

30.2 Suppliers and manufacturers may implement annual or periodic price increases, including changes at the beginning of a calendar or financial year. Calderpeel Architects cannot guarantee that prices quoted at the design or specification stage will remain available throughout the project.

30.3 Delays in approving quotations, making payments or authorising orders may result in revised pricing. Calderpeel Architects will communicate any known changes before committing the Client to additional expenditure, unless the relevant expenditure has already been authorised under an agreed written arrangement.

Product availability and discontinuation

31.0 All Goods are subject to availability when the relevant order is accepted by the supplier or manufacturer. Calderpeel Architects cannot guarantee that products will remain available between their initial presentation, Client approval and order placement.

31.1 Where a product becomes unavailable or is discontinued, Calderpeel Architects will notify the Client and, where appropriate, recommend suitable alternatives with updated costings.

31.2 Additional design work, revised quotations, replacement samples or supplier administration arising from discontinued products or Client-requested changes may incur additional fees where these fall outside the original agreed scope of services.

Supplier surveys, measurements and technical requirements

32.0 Certain suppliers and manufacturers may require site surveys, technical assessments, measurements or templating before confirming an order, commencing manufacture or undertaking installation.

32.1 Any such requirements must be accommodated as part of the procurement and installation process. Responsibility for associated costs will be determined by the agreed project arrangements and the relevant supplier or contractor terms.

Lead times, manufacturing and delivering

33.0 Manufacturing, production and delivery lead times provided by suppliers are estimates unless expressly confirmed as guaranteed in writing.

33.1 Calderpeel Architects will use reasonable endeavours to obtain anticipated lead times and coordinate procurement with the agreed project programme. However, Calderpeel Architects cannot guarantee the production or delivery schedules of independent third parties.

33.2 Where delays occur, Calderpeel Architects will endeavour to communicate revised expectations and assist with reasonable coordination.

33.3 Additional costs arising from delays or changes to the project programme, including storage, additional delivery attempts, contractor attendance, rescheduling and additional site visits, will be payable by the Client where reasonably incurred and not included in the original agreed scope.

International procurement and currency fluctuations

34.0 Where Goods are sourced internationally, the Client acknowledges that procurement costs may be affected by exchange rate fluctuations between the supplier’s quoted currency and GBP (£), together with any applicable international charges.

34.1 Any material changes to the expected cost will be communicated to the Client, where known, before the relevant transaction is committed.

34.2 Where Calderpeel Architects acts as Principal/Reseller, the agreed selling price and any permitted variations will be governed by Calderpeel Architects’ contract with the Client.

34.3 Where the Practice acts as Purchasing Agent, the Client is responsible for the actual supplier charges and properly disclosed transaction costs incurred on their behalf.

Procurement approvals, payments and order placements

35.0 No order will be placed until the relevant Goods, specifications and associated costs have been approved by the Client and the required payment or deposit has been received in accordance with the agreed payment schedule.

35.1 Depending on supplier requirements and the nature of the Goods, Calderpeel Architects may require payment in full or staged payments before placing orders.

35.2 Where Calderpeel Architects acts as Purchasing Agent, the Client must provide the necessary funds in accordance with the agreed procurement payment arrangements. Calderpeel Architects is not obliged to finance purchases or advance its own funds on the Client’s behalf.

35.3 Where Calderpeel Architects acts as Principal/Reseller, payment obligations will be governed by the agreed sales and payment terms.

35.4 Calderpeel Architects reserves the right to suspend procurement activity where agreed funds have not been received. Any resulting impact on quotation validity, stock allocation or production scheduling, together with any financial implications, will be communicated to the Client.

Warehousing and third party storage

36.0 Where Goods cannot be delivered directly to the property, or where deliveries need to be consolidated or coordinated with the wider project programme, Calderpeel Architects may arrange temporary or extended storage through independent warehouse, storage or logistics providers.

36.1 Unless expressly included in the agreed project proposal, all warehousing, storage, handling and associated logistics costs are additional to Calderpeel Architects’ design and procurement fees.

36.2 The Client is responsible for additional storage and handling charges reasonably incurred as a result of delayed building works, changes to the delivery programme, restricted access, delayed Client instructions or the property not being ready to receive the Goods.

36.3 Where storage periods exceed those originally anticipated, additional charges will apply in accordance with the relevant warehouse rates and agreed arrangements.

36.4 Where possible, the relevant warehouse will be engaged under a separate storage or logistics agreement setting out the contracting parties, storage location, applicable rates, services and liability provisions.

36.5 Where the Client contracts directly with the warehouse, the Client is responsible for its contractual obligations and associated charges. Where Calderpeel Architects contracts with the warehouse in its own name, Calderpeel Architects remains responsible for its contractual obligations to that provider, while the Client remains responsible for properly disclosed and agreed project-related storage costs, subject to Calderpeel Architects’ agreement with the Client.

36.6 Calderpeel Architects does not provide warehouse services or insurance where these are supplied by independent third parties. The Client acknowledges that warehouse providers may operate under standard trading conditions containing specific provisions relating to storage, handling, insurance, liability limits and claims procedures.

Insurance and responsibility for goods in storage

37.0 Calderpeel Architects does not provide insurance for Goods held at third-party storage facilities.

37.1 Where Calderpeel Architects contracts with a warehouse, it will use reasonable care in reviewing the relevant insurance arrangements within its agreed scope. However, Calderpeel Architects does not warrant that the warehouse’s insurance will cover every possible loss or the full replacement value of all Goods.

37.2 Calderpeel Architects will not be responsible for losses arising from uninsured or underinsured third-party warehouse arrangements, except to the extent that such losses are caused or contributed to by Calderpeel Architects’ own breach of contract, negligence or other legal responsibility.

Release and collections of goods

38.0 Goods will be released from storage and scheduled for delivery once the property is ready, delivery arrangements have been confirmed and any outstanding storage, handling and logistics charges due under the applicable agreements have been settled.

38.1 Calderpeel Architects will use reasonable endeavours to coordinate the release and delivery of Goods in line with the agreed project programme.

38.2 Where Goods remain in storage due to project delays or the property not being ready to receive them, the Client will be responsible for any additional properly incurred storage and handling costs.

38.2 Where storage periods become extended, Calderpeel Architects may notify the Client and recommend revised delivery or storage arrangements.

Appointment of installers and site readiness

39.0 Calderpeel Architects may recommend or coordinate independent installers to undertake installation works. Such installers remain responsible for their own workmanship, labour, tools, installation methods, technical compliance, site safety and performance of their contracted services.

39.1 Calderpeel Architects will use reasonable care when recommending or coordinating third-party installers but does not guarantee their availability, performance or workmanship and is not responsible for their independent acts or omissions.

39.2 The Client is responsible for ensuring that the property and relevant installation areas are appropriately prepared before the installer attends site, including providing suitable access and ensuring that any necessary technical information and approvals are available.

Returns, cancellations and bespoke goods

40.0 Returns, cancellations and amendments are subject to the applicable supplier or manufacturer terms and conditions.

40.1 Bespoke, personalised, made-to-order and specially manufactured Goods may be subject to restrictions on cancellation, amendment or return.

40.2 Any applicable cancellation charges, restocking fees, return transportation, manufacturing costs or other additional expenses will be communicated to the Client.

40.3 Signed-off items shall not be returned.

Independent suppliers and third party relationships

41.0 Calderpeel Architects may rely on independent suppliers, manufacturers, freight providers, warehouse operators and installation contractors to fulfil different aspects of the procurement and installation process.

41.1 Each third party is responsible for its own contractual obligations under the relevant agreement. Calderpeel Architects cannot guarantee the financial standing, continued trading, stock availability, manufacturing capacity, operational performance or future commercial decisions of independent third parties.

41.2 Where a supplier or contractor ceases trading, becomes insolvent, withdraws a product or is otherwise unable to fulfil an order, Calderpeel Architects will use reasonable endeavours to assist the Client in identifying the suitable alternatives.

Limitation of responsibility and statutory rights

42.0 Calderpeel Architects will not be responsible for delays, shortages, price changes, manufacturing defects, transportation failures, warehouse losses or independent installation errors to the extent that these arise from the acts or omissions of third parties and are not caused or contributed to by Calderpeel Architects’ own breach of contract, negligence or other legal responsibility.

42.1 Nothing in these Terms & Conditions excludes or limits any liability or statutory rights that cannot lawfully be excluded or limited.

42.2 Where the Client is acting as a consumer, these Terms & Conditions shall be interpreted in accordance with the Consumer Rights Act 2015, the Consumer Contracts (Information, Cancellation and Additional Charges) Regulations 2013 and all other applicable consumer protection legislation.

Construction design & management regulations 2015

Client duties

Clients must make suitable arrangements for managing their project, including the allocation of sufficient time and resources.

Arrangements are suitable if they ensure that –

(a)  The construction work can be carried out, so far as reasonably practicable, without risk to the health and safety of any person affected by the project, and

(b)  The facilities required by Schedule 2 are provided in respect of any person carrying out construction work.

The client must ensure that these arrangements are maintained and reviewed throughout the project.

A client must provide pre-construction information as soon as is practicable to every designer and contractor appointed, or being considered for appointment, to the project.

A client must ensure that—

Before the construction phase begins, a construction phase plan is drawn up by the contractor if there is only one contractor, or by the principal contractor; and

The principal designer prepares a health and safety file for the project, which—

•  complies with the requirements of regulation 12(5);

•  is revised from time to time as appropriate to incorporate any relevant new information; and

•  Is kept available for inspection by any person who may need it to comply with any relevant legal requirements. (If a client disposes of the client’s interest in the structure, he must provide the health and safety file to the person who acquires the client’s interest in the structure and ensuring that the person is aware of the nature and purpose of the file).

A client must take reasonable steps to ensure that—

The principal designer complies with any other principal designer duties in regulations 11 and 12; and

The principal contractor complies with any other principal contractor duties in regulations 12 to 14.

Where there is more than one client in relation to a project —

(a) One or more of the clients may agree in writing to be treated for the purposes of these Regulations as the only client or clients; and

(b) except for the duties specified in sub-paragraph (c) only the client or clients agreed in paragraph (a) are subject to the duties owed by a client under these Regulations;

(c) The duties in the following provisions are owed by all clients—

(i) Regulation 8(4); and

(ii) Paragraph (4) and regulation 8(6) to the extent that those duties relate to information in the possession of the client.

Where there is more than one contractor, or if it is reasonably foreseeable that more than one contractor will be working on a project at any time, the client must appoint in writing—

(a) A designer with control over the pre-construction phase as principal designer; and

(b) A contractor as principal contractor.

The appointments must be made as soon as is practicable, and, in any event, before the construction phase begins. If the client fails to appoint a principal designer, the client must fulfil the duties of the principal designer in regulation 11 and 12. If the client fails to appoint a principal contractor, the client must fulfil the duties of the principal contractor in regulations 12 to 14.

A project is notifiable if the construction work on a construction site is scheduled to—

(a) Last longer than 30 working days and have more than 20 workers working simultaneously at any point in the project; or

(b) Exceed 500 person days.

Where a project is notifiable, the client must give notice in writing to the Executive as soon as is practicable before the construction phase begins.

The notice must—

(a) Contain the particulars specified in Schedule 1;

(b) Be clearly displayed in the construction site office in a comprehensible form where it can be read by any worker engaged in the construction work; and

(c) If necessary, be periodically updated.

For further advice and reading on this matter please refer to www.hse.gov.uk

The building regulations 2010 (2023 amendments)

Client duties

Suitable arrangements to ensure compliance with requirements etc:

11A.—(1) A client must make suitable arrangements for planning, managing and monitoring a project (including allocation of sufficient time and other resources) so as to ensure compliance with all relevant requirements.

(2) Arrangements under paragraph (1) are suitable if—

(a)they ensure that the design work is carried out so that the building work to which the design relates, if built, would be in compliance with all relevant requirements;

(b)they ensure the building work is carried out in accordance with all relevant requirements;

(c)they enable the designers and contractors to cooperate with each other to ensure compliance with all relevant requirements; and

(d)they provide for periodic review of the building work (and the design work) included or to be included in the project so as to identify whether it is higher-risk building work(4).

(3) A client must ensure that the arrangements under paragraph (1) are maintained and reviewed throughout the project.

(4) A client must provide building information as soon as is practicable to every designer and contractor on the project.

(5) A client must cooperate with any other person working on or in relation to a project to the extent necessary to enable any person with a duty or function under these Regulations to fulfil that duty or function.

(6) Where there is more than one client in relation to a project—

(a)the clients may agree in writing which of them is to be treated for the purposes of these Regulations as the client;

(b)except for the duties specified in sub-paragraph (c), only the person who agreed to be treated as the client under sub-paragraph (a) is subject to the duties owed by a client under these Regulations;

(c)the duties in the following provisions are owed by all clients—

(i)paragraph (4) to the extent that those duties relate to information in the possession of the client or which is reasonably obtainable by or on behalf of the client;

(ii)paragraph (5); and

(iii)regulation 11B (arrangements as to information: higher-risk building work).

Arrangements as to information: higher-risk building work

11B.—(1) A client must make suitable arrangements to ensure information is provided to the designers and contractors working on a project which includes any higher-risk building work to make them aware that the project includes higher-risk building work and the nature of the higher-risk building work.

(2) Paragraph (1) includes a duty to periodically review the building work (and the design work) included or to be included in the project so as to identify whether it is higher-risk building work and to ensure information is provided under paragraph (1) where the work becomes higher-risk building work.

Domestic clients

11C.—(1) Where the client is a domestic client the duties in regulations 11A(1) to (3) and 11E(2) to (5) must be carried out by—

(a)where there is only one contractor for a project, the contractor;

(b)where there is more than one contractor for a project—

(i)the principal contractor; or

(ii)the principal designer where the client and the principal designer agree in writing the principal designer is to fulfil those duties.

(2) If a domestic client fails to make the appointments required by regulation 11D (principal designer and principal contractor)—

(a)the designer in control of the design phase of the project is the principal designer;

(b)the contractor in control of the construction phase of the project is the principal contractor.

(3) Regulation 11D(5) does not apply to a domestic client.